Maritiem Digitaal
collectie zoeksyteem van de maritieme musea
Koker met technische tekeningen van m.s.'Neddrill 1' en Neddrill 2'
titel | Koker met technische tekeningen van m.s.'Neddrill 1' en Neddrill 2'
|
---|
inventarisnummer | TS9268
|
---|
collectie | technische tekeningen P & O Nedlloyd
|
---|
museum | Maritiem Museum Rotterdam
|
---|
maker | Giessen-De Noord N.V., Van der[scheepswerfnaam]; Koninklijke Nedlloyd
|
---|
scheepsnaam | Neddrill 1, Neddrill 2
|
---|
omschrijving | Guides for bop stack in moonpool (62085-25.003).
Hydraulic system moonpool diagram (62085-42.001).
Arragement Boilers and evaporators in former store (62095-31.001).
Freshwater distilling diagram twin nirex-unit (62095-32.002).
Additional supports on removable frame for B.O.P. stack 21.1/4 - 2000 (72019-23.002).
Operation of WT door in bulkhead 128 hydraulic diagram (72019-43.010).
Arragement generator room with ventilation (N1-M-001B).
Ventilation of pumproom fore and space above top of tanks (N1/ 2 -M-004A).
Ventilation of mud area (N1/2-M-006).
Arragement Machinery space on tweendeck +7250 (N2-M-007).
Arragement steamboiler and hot-well (N1/2-M-011).
Tensioner line lay-out DP ship 3000ft waterdepth (52038-23.016).
Proposal drilling template and guide base on BOP stack top frame (52038-23.026).
Standpipe manifold HP mud system (52038-43.016).
Retractable hydrophone support arm (52038-44.004).
Tensioner lugs on supportring DP ship (52038-44.010).
Platform from moonpool to accomodation I (52038-45.004).
Platform from moonpool to accomodation II (52038-45.005).
Arragement pipehold I deepsea drilling 4000 ft (52007-021-001).
Arragement pipehold II deepsea drilling 4000 ft (52007-021-002).
Pipe handling above hold 1 and 2 deepsea drilling 4000 ft (52077-21-005).
Pipe handling above piperacker and maindeck deepsea drilling 4000 ft (52077-21-006).
Cross section piperacker deepsea drilling 4000 ft (52077-21-007).
Handling moonpool plug (62004-23.001).
Revised excisting spider beam construction (62.085-23.002).
Moonpool BOP guides (62085-23-003).
Removable platform on " T ' slot (62085-23-004).
Mud system (N1-2-P-007).
Fillingstation midship (N1/2-P-009).
Hot and cold freshwater supply accomodation on foreship (N1/2-P-010).
Plan scupper and discharge pipes accomodation foreship (N1/2-P-011).
Fire steam condensate compressed air and seawater lines in accommodation forward (N1/2-P-012A).
Lub.oil fuel oil and startingair system in geneatorroom (N2-P-013).
Cooling water systems generatorroom (N2-P-013).
Diagram of pipelines in generatorroom (N1-P-0113).
Seawter sustem in pumproom foreship (N-1-P-014).
Sanitary sewage and scupper lines aftership (N1-P-016).
BOP hydraulic control system (N-1-2-P-021).
Standpipe manifold HP mud system (N1-2-P-032).
Steam feed and condensate system (N-1-P-001).
Steam feed and condensate system (N-2-P-001).
Foam CO2 system and fire extinghuising lines on deck (N1-P-003).
Foam CO2 system and fire extinghuising lines on deck (N2-P-003).
Diesel oil supply system midship (N1-P-004).
Compressed air system (N1-P-005).
Compressed air system (N2-P-005).
|
---|
Commentaar van bezoekers